THE CORPORATION OF THE TOWNSHIP OF STRONG
BY-LAW
#93 – 1305 AS AMENDED
BUILDING
BY-LAW SCHEDULE “B”
PERMIT
FEE SCHEDULE
AMENDED June 14th 2005 BY
RESOLUTION #5 Effective July 1st 2005
Fee
Schedule is based on Construction Cost Guidelines
$50.00 + $9.00 per
M to $50,000
$50.00 + $450 +
$7.00 per M to $100,000 (for next $50,000)
$50.00 + $800 +
$4.00 per M to $200,000 (for next $100,000)
$50.00 + $1,200
+ $2.00 per M over $200,000
$50.00 Change
of Use Permit – Inspection fee only with no Building Permit Issued
CONSTRUCTION COSTS GUIDELINES – cost per square foot of floor area
Residential Unit:
Single Storey House $115.00 minimum per square foot
Two Storey House (1st floor) $115.00
minimum per square foot
Each Additional Storey $55.00
minimum per square foot
Attached Garage $25.00 minimum per square foot
Cottage/Recreation Dwelling:
Dwelling on Piers/Frost wall $90.00
minimum per square foot
Dwelling on Slab $90.00 minimum per square foot
Each additional storey $55.00 minimum per square foot
Garage/Shed on Slab $20.00 minimum per square foot
Garage/Shed no floor $15.00 minimum per square foot
Barns/Outbuildings located
on Assessed Farm Lands $15.00
minimum per square foot
Based on cost price……. or $85.00
minimum per square foot
Demolition Permit $
5.00 minimum per square foot
No Permit is required for re-shingling a roof
A permit is required for re-roofing with metal roof or metal siding
No Permit is required for a
Building less than 100 sq. ft. but must adhere to the zoning by-law set back
requirements for Accessory Buildings.
To Obtain a Building Permit, it is necessary to First Apply for and
Receive the following:
1.
A septic permit for a Class 4 Sewage System from North Bay Mattawa
Conservation Authority in all areas not serviced by Municipal Sewers and for
Buildings that require plumbing facilities.
2.
An Entrance Permit or Culvert Permit from the Municipality if necessary
3.
An Entrance Permit or Building Permit from the Ministry of
Transportation if the property fronts onto a King’s Highway or Secondary
Highway or is within 1000 feet of a Highway Intersection or is in the Vicinity
of the New 4 Laning of Highway #11.
4.
The Township of Strong requires a Municipal Services Permit be signed
where future school bus service or Winter Maintenance is NOT required. This form must be signed by the property
owner.
5.
A Legal Survey may be required if the survey stakes are not clearly
visible to the Chief Building Official.